Feeds:
Posts
Comments

Archive for the ‘architecture’ Category

Bridge numbers. I like bridge numbers. Bridges that cross canals and railways (and motorways for that matter) all have numbers. Names are good, but numbers give you a sense of where you are. On canals they are an essential navigation aid. But bridges over rivers don’t need numbers. The difference between things you go over as opposed to things you go under I guess. Still, I’m counting these bridges over the Tees. Cow Green Dam Wall isn’t technically a bridge, so Birkdale Bridge is no.2. It’s a litle way to no.3.

We left the river below Birkdale Bridge as it plummeted down Cauldron Snout. This cascade is more a series of cataracts over a 180m length – making this the longest waterfall in England. There’s a good clamber down the entire south side over the dolerite pillars of winsill so plenty of places to admire the power of the water as it plummets down a total of 60m. Even on relatively dry days, as the water is regulated at the dam it’s always an impressive sight.

cauldron snout brdge.jpg

There used to be a little wooden footbridge across the falls – about halfway down.  This would have given an incredible view of the torrents below. Before the reservoir was built, the river ran round a long sweeping crescent picking up speed so by the time it reached the top of Cauldron Snout it was already wild and raring to go. The wooden bridge disappears from the maps by the 1940s and a track bridge appears about where the dam wall is today. But never both together. The amazing moving bridge. There’s more of these to come further downstream..

At the base of the falls, the river meets with Maise Beck – one of its larger tributaries at this end and corners beneath the cliffs of Falcon Clints. This next section along the shadow of Cronkley Fell is wide and flat. The river here is very wide given how young it still is. It’s very shallow but very fast. From here to the top of the next waterfall, High Force – about 6 miles away – it’s got 100m to fall so it’s on a bit of a sprint while it can. The landscape here is classic glacial pasture. big wide and relatively flat land with steeply rising fells beyond. Thousands of years ago this valley was scoured out by the receding ice flows. Long before that, these carboniferous rocks stretched across to the much older Lake District and formed a border with the still separate Scotland. It’s a very old landscape indeed.

file-04-02-2017-16-56-57

 

 

As the land flattens out, so the farms start to appear. First up on the left is Widdybank Farm. As remote hill farms go, this is particularly remote.Yet along the banks of the river the pasture area is flat and fertile. Great for cattle, but still too exposed and high up to grow anything meaningful.

file-05-02-2017-12-28-44

There are no bridges for miles, but the river is wide and shallow and during the summer months certainly fordable at any number of points.

File 05-02-2017, 12 47 26.jpeg

Further along on the north bank are the remains of a pencil mill. Here the sedimentary rocks were ground down and  pressed into moulds to make pencils. The mill opened in the mid 19th Century and produced pencils – know locally as ‘widdies’ until 1890.

The river winds and widens until near the far end of Cronkley Fell we find Cronkley Bridge. Bridge no.3 in my book. This is a simple steel girder span over two intermediate stone pillars with a wooden deck. It’s flat and utilitarian and is probably 1950s. The main feature is its length – about 40m. We won’t see another longer bridge for over 30miles. You would normally build a bridge at its narrowest point. It’s certainly the cheapest way to build one. I imagine, as the river is shallow and with a flat rocky bed, this would be an ideal fording point, but a bridge has been marked here on maps certainly from the mid 1800s.

file-04-02-2017-16-55-13

I had planned on following the river towards High Force about a mile downstream, but a loose and very vocal dog at one of the farms clearly had other ideas, so that bit is another for a revisit. Cronkley Bridge is on the Pennine Way so it’ll be a bit busier later in the year. Also, from March the wading birds return to nest on these high moors. Today it’s almost silent, but by mid April the air here is filled with the strange whoops and warbles of Curlew and Lapwings, the buzz of snipe and the cackle of grouse – over 3/4 of England’s native Back Grouse live in these barren hills of the North Pennines.

But that’s bridge no.3 done. The next four are all walking distance from where I live so familiar territory for a bit…

Read Full Post »

Maybe it’s that new year thing when you start out with good intentions – bold ideas, long-term plans, fresh start or whatever, but I guess every new thing has to start somewhere, at sometime. It seems that the winter months are when I look ahead to the coming year and finally get to start working on new projects. There’s still some gaps in the overall view of the year, but from what’s already there I’m getting a feel for the overarching themes. While last year was more about textures and moments, this year looks like being one of spaces and voids. Strange how things find their own threads.

Last year I really got to know some of the river where I live. I spent large chunks of time watching it, filming it, photographing it, editing the results and creating the major piece of the year – ‘Waterfall‘. I’ll probably do a more in-depth post about that at some point, but for those new to the game, ‘Waterfall’ saw three white-washed field barns wrapped in slow-motion film footage of the three main waterfalls of the River Tees. Each barn became a visual cube of slow moving water in the night sky. It was big and awesome and probably the best thing I’d done in a long long time.

Since that piece I’ve had an uncomfortable relationship with the river. I used to go down there almost every day, but the daily photographing and research has probably made me over familiar now and some of its magic is somehow lost. I kind of know how it does all its tricks now.

So I needed to find a way to re-engage with the river. There are new things I need to discover. I need to find another story in it.

Then last week I caught up with Andy Carters ‘270’ project on his Calling All Station YouTube channel. Over the next 52 weeks Andy  is aiming to visit all 270 stations on the London Underground. To make it more interesting he has to pass through the ticket barriers at least once at every station – either coming or going through them, not just passing through on a train. It’s this slowing down of the travel that makes you stop, look, think and examine the familiar. About 40 stations in (starting with the boring bits of the  Jubilee Line) and I’m already hooked. Each station is documented on his blog as he goes along too, creating a comprehensive gazetteer of architectural gems and subterranean secrets beneath the capital.

Inspired by his journey, I’ve decided on mine – to visit and cross* every crossing of the River Tees from source to sea.

Bridges are fascinating things. I’ve had my own experiences in constructing them. Essentially they are practical engineering – a way of traversing in this case water. Yet as purely man made structures in what is on this route, mostly open countryside, they have a very distinctive presence within the landscape to manage.

Today I made a start. The purist in me wanted to start at the source and work progressively downstream. However, it’s still very much winter and as the Tees starts just below the summit of Cross Fell – the highest peak on the Pennines – and very much buried under snow for the next few weeks I’ve decided to scrap that and not be precious about the order in which I visit the bridges.

My first crossing then wasn’t even a bridge. It was also one of the biggest structures on the river – the dam wall at Cow Green Reservoir.

file-30-01-2017-17-02-50

Between 1969 and 1971, a section of the Upper Tees was flooded to create the 2-mile long Cow Green Reservoir as a part of of a series of interventions to regulate the flow of water down the river for abstraction purposes. The 1/4 mile long concrete reinforced embankment holds back 40,000,000,000 litres of water (count those zeros!) while the entire river flow is regulated by sluices on the southern bank. So technically the River Tees flows beneath it, so the dam wall is a crossing.

file-30-01-2017-17-07-48file-30-01-2017-17-03-33

The reservoir sits in a natural basin of pasture land high in the North Pennines. The landscape here is a unique blend of very specific geology and rare botanical habitat. Widdybank Fell which sits along the Durham side of the water is home to the rare Blue Gentian  and the only place in the UK where alpine plants have survived since the last great ice age. The land here is fertile and remains of bronze age summer farms lie beneath the reservoir – themselves an indicator of how climate changes over time. Back then temperatures in these upper fells were around three degrees warmer. It might not sound much but the weather here is now too cold for most wading birds to breed on the reservoir. On a fairly bright day like today it felt relatively mild a few miles downstream, yet up here the shaded bays on the water are still iced over and pockets of snow lie in the heather.

file-30-01-2017-17-01-52

Today the reservoir sits in the Moorhouse National Nature Reserve – the largest nature reserve in the UK taking in the highest fells in the Pennine chain and the upper catchments of the River Tees.

The wall is an immense brutal slab of industrial infrastructure. Its scale and construction means it’s never going to blend in (whatever that means) and makes a bold statement within the landscape. Yet, the sparsity and relative bleakness of this part of the dale tolerates its monolithic brutality. The scale of the landscape seems to just swallow it up. As the river rushes quickly away from the wall thinly over bedrock, there is a greyness and roughness, that is almost alien in spirit and the concrete meets the bedrock as an ancient ancestor and the family resemblance is still there.

Within yards of the wall, the river passes beneath Birkdale Footbridge. This is the first of the bridges in County Durham and is still a border crossing between Durham and Cumbria. Built in 1966 – and just predating the dam wall – it’s made from a concrete span sitting on two reinforced stone pillars in the river. Like the dam, it’s a very utilitarian structure and supports a private access road and the Pennine way.

Downstream of the bridge the river disappears down a series of dramatic cataracts between basaltic columns of winsill. At a total of over 200ft, Cauldron Snout is one of the main waterfalls of the River Tees and shows how fast the water develops its wild character from the man-made sluices of the reservoir.

file-30-01-2017-17-21-18

So this is where my journey this year begins. I’ll back track when it’s warmer to find the source of the river and the only bridge beyond the reservoir, but I’m looking forward to discovering the journey of the water from the sluices as it cuts its way through the landscape towards the sea, and how people have built ways of traversing it.

It’s a long a winding story and I’m looking forward to discovering the stories and narratives of those crossing places. it’s a rich history and along the way I’m going to find Romans and Saxons, and JMW Turner and Lewis Carroll and railways and steel and plutonium. Lots of landscape and lots of engineering. And lots of walking.

 

*ok. so I won’t walk over the railway bridges,or motorway one and will probably give the pipe bridges a miss too

Read Full Post »

The middle of winter is certainly feeling like it this year. It’s not particularly wintery in the weather, but it certainly feels darker and more gloomy. Anyway, we’ve past the shortest, darkest day, technically. Now the days are getting longer again we can look to the future and think about the year ahead. But it’s also that time of year where we look back at the past year and take stock.

For me 2016 has felt like a particularly busy year. The tail end in particular was a bit hectic at times. But it’s been a productive one. Lots of new things – new people, new works and new places to work with.

‘Lotus Souvenir’ – large origami lotus flower installation at Bicester Village, Oxfordshire. UK. in February.

Lumb Mill Viaduct

Lumb Mill Viaduct

‘The Scenic Route’ was a short research residency walking two former railway lines in Lancashire.

‘PaperBridge’ had a variety of outings over the year – includig being featured on a TV show on the Discovery Channel, being in a book on micro architecture and being presented to the King and Queen of Lesotho. A smaller working model was shown in an exhibition of paper design in Chicago, while drawings and a short documentary was shown in Nova Scotia and Montreal.

September saw the start of a series of back-to-back installations right across the North of England, starting with ‘Tower’ – an architectural intervention at the Festival of Thrift in Kirkleatham.

From September to November I did a series of installations across Lancashire for a commission. ‘When the Red Rose…’ saw temporary interventions in Preston, Blackpool and Lancaster. A fourth on the canal at Blackburn sadly didn’t happen, but I’ll keep that one back for another day.

The major piece of the year however, was just three fields away from where I live.

Three barns were wrapped in slow-motion projections of waterfalls from the nearby River Tees. Over six short nights over 2,000 people ventured to see the work, in the dark in a quiet, remote corner of County Durham. Blessed by a harvest moon the first weekend and by clear skies with resident milky way the second, no number of photos or videos can ever capture the experience those lucky 2000 had.

While it was a good year for interesting and ambitious new works, for me ‘Waterfall’ stood out as probably the best piece I’ve done so far. And to do it on my own doorstep, in front of my own local community was a particularly special thing to do.

Just as good as being able to do all those installations, exhibitions and workshops was all the wonderful people I got to work with. None of these can happen without teams of people dedicated to making them happen – from those commissioning the work and those fabricating some of the pieces to those who work tirelessly to promote the work or organise the epic tasks they can sometime become. So hopefully I haven’t missed anyone off but here goes:

Nancy Kryzanowski, Gemma Jackman, Sally-Anne Blaise, Caroline Ruddick, Paul Gray, Phil Carr and Alan Carr Print & Design, Premier Papers in Gateshead, Nick Hunt, Melanie Diggle, Diana Hamilton, Roy Halliday, Nick Lund, Julie Tomlinson and James Cropper plc, Lexi Gerry, Jon Stynes, David Metcalf and October Films, Aleta Florentin, Vianna Newman, Harvey Lev, Judith Bauer, Diane Spark and all at UTASS, Ian Hunter, Paul Chaney, Alex Murdin, Henk Keiser, Brenda Vrieling, Jan Hartold, Vicky Holbrough, Nicola Golightly, Stella Hall, Trevor at Kirkleatham Old Hall, Christina Hesford, Janet Rogers, Paul Murray, Becky Nicholson, Kirsty Childs, Jill Bennison, Karen Marshall, Kate Percival, Lowri Bond, Sara Cooper,  Jane Shaw, Fiona Goh and Holmfirth Arts Festival, Sarah Branson, Jamie Frost, Thomas Charveriat, Sarah Gent, Sarah Mayhew-Craddock, Lucy Jenkins, Rebecca Turner, Harry and Kate Vane, Ewan Alinson, Jill Cole, Malcolm Walton, William Burton, Chris Woodley-Stewart, Nicki Cullens, Shane Harris, Mark Tyler, Ryan May and Hightlights, DCC events team,  Lyndsey Waters, Tim Joel, Richard Baxter, Rita Whitlock, Ella Byford, Justina Ma, Sally Jastrzebski-Lloyd, Anna Izza, Hannah Leighton-Boyce, Keri Sparkes, Jen Morgan, Catherine Shaw, Philippe Handford, Jamima Latimer, Louise Miller, Mike Neale, Stacey Walker, Julie Brown, Sandra Blue, Brent Lees, Friends of the Storey Garden, Rebecca Johnson, Laurie Peake, Sarah Steele and Preston Methodist Chapel, Alex Rinsler, Mykey Young, Richard and the Lightpool team, Zoe Dawes, Jenny Needham, Flossie Mainwaring-Taylor, Trevor Brookes, Martin Paul, John Gillmore, Heather Fox, Jennie Collingwood, David Turner, Andrew Barton, Paul Kingston…

I hope I haven’t missed too many off. That’s quite a team and a huge thanks to everyone on the list – I seriously could not have done all I have this year without each and everyone of you.

So, that’s it for this year now. Next year is another year. It’s going to be an interesting one for so many reasons, but I hope it’s more in a positive way.

Onwards and upwards…

 

Read Full Post »

Success. It’s a great concept, but what do you mean by success? Sure fast cars, big houses and pots of cash can be a fair indicator, but success can exist at all levels – like when your Yorkshire puddings rise evenly or when you put a piece of IKEA furniture together and you don’t have any pieces left over.

But what about art? When would you consider yourself a successful artist, or even how do you measure the success in an artwork? These are the kind of things you have to evaluate for funding reports and consultations. Stuff I don’t like doing and generally try to avoid, mostly because it’s full of questions like this.

Sure, last year’s PaperBridge in the Lake District seemed to be a success. It went up and stayed up. It even went down well with visitors attracting nearly 10 times what I’d anticipated. Pictures of it went around the world and it appeared on TV on four continents. That’s pretty successful isn’t it?

IMG_5796 - Version 2

‘PaperBridge’ in BBC Focus magazine

Well, if being popular with the general public is the measure of success then yes. But as a work of art, how do we measure success for that? Did it do all the things art needs to do? I’m not sure how we work that out. I’m quite sure it didn’t fail though. That’s a different thing.

One recent TV interview asked me about risks involved in putting up a bridge made of paper. In particular they wanted to know how sure I was that the one in China would take a car going over it. The honest answer to that was I wasn’t sure. It had never been done before at that scale so how would anyone know? In fact there was a very real risk that it wouldn’t work. It could so easily have failed and collapsed and trashed a £100k car. Sure we  took lots of precautions and did lots of complicated calculations. We even enrolled a world leading structural engineers to check it all over with the latest hi-tech computer modelling. But at the end of the day they had to admit there were too many unknowns involved in building big structures out of sheets of paper – a material not made for building bridges out of – to sign it off as safe. In short – no one knew for sure it was going to work.

On one level the risk-taking was part of the deal. That element of peril was part of the narrative. If it was easy it wouldn’t have been as big a deal. If it was easy someone else would have done it before, I’m sure.  Actually, as I’d built a bridge before I kind of knew how they behaved and was sure it’d be fine, so I probably over did the risk bit for dramatic effect – but I certainly didn’t tell the client.

What was important was that everyone involved was aware of the risk and was happy to take that risk with me.

IMG_4287 - Version 2

RangeRover on ‘PaperBridgeChina’. Suzhou, November 2015

There’s a real element of risk in all my projects. Someone once said to me – if you have a 100% success rate, you’re not taking enough risks. When you’re pushing at the boundaries of things, that’s where the excitement comes in and if you manage to pull it off then that’s where great things can happen.

In that respect, the opposite to risk and success is mediocrity. There’s nothing more dangerous than playing it safe. Taking the easy road. That’s where things get stuck or become so half baked they start to deteriorate into something much much worse.

File 19-04-2016, 20 23 54.png

Mediocrity in all its splendour. This ad screen in Newcastle is sturdy, health and safety compliant, practical and meets all the planning regulations. What’s not to like? errr…. (image © James Perry via twitter)

Failure on the other hand isn’t so bad. Every now and then I have a project fail in me. More often then not it’s at such an early stage no one ever knows. I’ve lost track of the number of times projects I’ve been asked to get involved with have failed at the proposal stage. Some don’t even get that far. Mostly these are because the client doesn’t want to take a chance. Play it safe maybe. In which case, they’re just not the people I want to work with. Occasionally a project will get all the way to the final piece and then fail in spectacular style. That’s a different issue. I once had a high profile piece that was supposed to be up for 5 months, however it blew away after 5 days. Still, it went in if only for a short while, and even led to a chapter in a large international publication about just why it failed – the reasons were really interesting. I’m not sure the client saw it that way mind.

And then there’s the times that failures aren’t really failures. ‘Metropolis’ – the fritz Lang cinematic masterpiece. The first film with a final budget in the millions. It was only ever shown at one cinema before being deemed a flop by the studio. It was subsequently re-edited to a shorter story in an attempt to reclaim the costs.

metroufa4

photo: Alex Stocker (1896 – 1962) – Ufa-Pavilion, Berlin. 1927

 

Schubert never heard any of his symphonies performed. Very little of his orchestral music was performed at all during his lifetime, yet his ‘Unfinished’ symphony is now regarded as one of the greats of its time.

More recently, Anish Kapoor’s ‘Orbit’ became the victim of a playing it safe mentality with the producers and suffered from an incursion of mediocrity that has now extended to installing a helterskelter slide down it. I think time is yet to decide on that piece.

IMG_3541 - Version 2

‘Orbit’ by Anish Kapoor at the Olympic Park, London. 2012

If I’m being brutally honest, I think there are problems with most of my pieces. There’s always something that doesn’t go to plan or work out quite how I wanted it. However, in most cases these are things other people generally don’t notice. Or I make a feature of them. That line between success and failure is so fine. So delicate in fact it’s barely there. Or at least not so you’d notice.

 

post script.

Since writing this bog post (sitting outside in the sun with a cup of tea) I’ve just stumbled across this wonderful book on failure by Erik Kessels. He does it so much better than me. Not sure why I bother sometimes…

Read Full Post »

Last week I went to see the paper from the bridge finally get pulped and recycled. Half-tonne bundles of the now sun-bleached red paper were carried into the pulping shed at the paper mill on a fork-lift before being unceremoniously tipped onto the conveyor belt that started their journey of rebirth.

pulping the bridge

last journey

one load of bridge paper about to drop into the pulper

It wasn’t so much a desire to see the destruction of the last bits of the bridge, but more out of interest to see just how simple the recycling process was. Paper is such a basic material. At its heart it’s just a mass of fibres lying randomly on top of each other. They’re not even woven together. The fibres just lie in a general direction that dictates the way it curls when dry. Recovering the fibres from used paper is just a case of tipping them into a giant blender where the sheets are shredded by rotating blades and mixed with warm water to help soften everything.

pulping the bridge

The entire process, from conveyor belt to reel of finish product, probably takes about an hour, plus some pausing time for colour matching and keeping up with the manufacturing process.

matching colour

the pulp is topped up with dyes to match the colour of the intended product

pulp on the mesh

the pulp is sprayed onto the fine wire mesh. It’s still mostly water at this stage

cutting the paper

as the water is removed through drying it slowly becomes paper. The paper is cut to the final width before meeting an identical layer from beneath to make the final thickness

drying process

the water content reduces over the length of the process. It’s down to about 60% water here

drying roller

one of the final drying rollers

final roll

the final paper on giant rolls ready for finishing

For me this was very much an end point to the project. Or at least the physical existence part of it.

There’s something about this project in particular that seems to have made a connection with so many people. Two months on from building the stone gabions, I’m still getting daily requests from picture editors and journalists around the world running stories about the bridge.

Back at the launch day six weeks ago there were no journalists. No photographers. Our perfect timing had meant unveiling the bridge the same day as the results of what everyone though would be the closest general election in decades. Beyond politics and the UK, it was also press day for the Venice Biennale – the largest art event in the world. In PR terms we couldn’t have picked a worse date.

To top it all, in the craziness that was the tight schedule, we only put up three A4 posters to tell people it was happening. That anyone turned up at all, on the face of it, was nothing short of a miracle.

Actually, it wasn’t a miracle. It was the result of weeks of determination and hard work by the marketing and press teams at both Cumbria Tourism (one of the main partners in the the funding consortium) and James Cropper – the paper manufacturer. What started off as some solid coverage by local press and TV in the lead-up weeks, grew rapidly after the opening weekend. As the political stories became old news picture desks were desperate for something light and positive. By the Monday the pictures by North News’ Paul Kingston had made the Times and the Daily Mail – including the Mail Onine – despite its questionable ideas about what constitutes news, it’s still the largest online news outlet in the World.

north news pic

An image by Paul Kingston for North News. My kids enjoyed their brief modelling career too

By the Tuesday the online design publications had got hold of the story and were running it on their front pages. As did the Newcastle Journal.

newcastle journal front cover

By Wednesday my email inbox was constantly full with requests for info, interviews and images coming in faster than I could reply to them. My twitter feed was constant with reports from people visiting the bridge and posting pictures all over social media.

On the Thursday I was in London for the day (no mean feat from where I live) and building a 1/4 size bridge out of A4 paper in front of broadcasting house and appearing live on prime time BBC TV.

bridge on one show

explaining the paperbridge to the presenters of BBC’s One Show outside broadcasting house, central London

paperbridge on live tv

presenter Alex Jones tries out the model bridge on live TV!

By Friday the bridge had been on TV in the US and Canada and I was doing telephone interviews throughout the day across various timezones. Social media mentions were by now in multiple languages – from German and Italian to Korean and Arabic

On the Saturday I had the day off to do another little installation in Yorkshire.


I’d seen some pictures on twitter of crowds at the bridge on Saturday, so on Sunday – the penultimate day of the bridge, I thought I’d go down and see for myself.

It’s a tidy walk up to the top of Grisedale from Patterdale. It’s not a difficult walk. The first part just follows the lane up from the village. The steepest section is on tarmac so it’s not that steep really. By the time the road runs out you’re about halfway there. Once past the last farmyard with the newborn cattle the track becomes a rocky path and the landscape is noticeable wilder. Where it opens out again at the head of the valley the bridge suddenly became very clear. Sitting in the first bit of green beneath the craggy backdrop with Nethermostcove Beck tumbling over falls on its way down. A feint boggy path diverges from the main valley path at this point towards the wooden bridge over Grisedale Beck. This is the wettest and muddiest part of the journey. One wrong footstep and the black peat is halfway up your shins. I dread to think how many trainers were waterlogged on that last bit.

The main path is a popular path in the Lake District. It’s part of the Wainwright Coast to Coast path, and a starting point for those heading up Fairfield, St Sunday Crag or tackling the mighty Helvellyn. The Lake District is a busy place for walkers and you’re rarely alone on any of its miles of well maintained paths. On a typical sunny weekend you’ll probably pass twenty or so other walkers on your way up from Patterdale. 

On that Sunday I passed 200.

That was my first clue as to how busy the bridge was. It wasn’t even a great day for a walk. It was windy and the wind was bitingly cold – particularly up at the bridge where the prevailing winds come off the mountains behind – still with their crests of snow on the top.

My works are all about the audience experience and I like going to see how people are experiencing them. There’s something nice about going back on my own and mingling with other people to try and see it how others do. It’s also nice that I can usually go without anyone knowing I’m the artist so I get to find out what people really think rather than the polite responses you get on surveys or on guided tours and artist talks.

early crowd

an early crowd of walkers from Yorkshire

From the day it was finished, the bridge was never all that quiet. I’d visited a number of times over the week for various reasons and at different times of the day, and I was rarely on my own there for long at best. One morning I set off at first light to get the early morning sun picking out the bridge against the crags. When I arrived there was already a few others doing the same, including one keen photographer who’d set off from Ashington at 4am with the same idea. Earlier in the week we’d been up doing some TV interviews until gone 7pm and still people were wandering up the valley to visit.

Yet, on that final Sunday morning the crowds were still an unexpected surprise to me. There was a constant stream through the field gate, people in the beck getting photos, families on the outcrops having picnics. At one point there was even an orderly queue of people from the gate up to the bridge with people wanting to walk across it and have their selfie moment.

sunday crowd

It was all very civilised and good natured. Everyone was clearly enjoying the experience. The demographics were across the spectrum – families with small children, seasoned walkers, older people out with the dog, fell runners, mountain bikers. But lots of people just out in their (very muddy) trainers. And every one of them had made the two-mile walk out on foot.

queue

you don’t get more British than that – queueing in the middle of nowhere. in the rain.

More than that. Every one of them had travelled to Patterdale and then made the five mile round trip from the car park. Even for people in ‘nearby’ Kendal or Penrith, that constitutes a four or five hour commitment to visit the bridge. To engage with art. Many travelled much further. There are very few galleries in the world who can claim to match that from their visitors.

A few figures for you. Patterdale is home to around 400 people – including the surrounding hamlets. Over just 11 days, around 8,000 people visited the PaperBridge. Most of them crossing it and taking pictures. Pictures and stories about the bridge appear in magazines, newpapers and online publishing in every continent. To date over 44 million people have read an article online, seen a picture in a newspaper or watched a feature on TV about the bridge around the world.

Twitter and Facebook were full of photos of people standing on the wobbly top of the bridge in all weathers. In ones, twos or more. I saw one with seven people crowded on. A local holiday let company even posted a picture of their MD drinking a cup of tea on the top. That’s a fair way to drag a dining room chair – total commitment!

Sally drinking tea on the bridge

As well as spreading the word and engaging people with the project, social media played a major part throughout the project. Every morning when I woke I checked my social media streams for pictures to see how the bridge was holding out. Particularly comforting in bad weather. Almost everyone involved got there via connections on Facebook and twitter. When my email inbox got unbearable communication was done via direct messaging on Twitter. Tracking the #PaperBridge tag alerted us to media stories around the world we otherwise would have missed. In turn, those social media connections have opened up whole new avenues for me to explore.

It’s been one heck of a journey these past few months. That bright red arch over a remote mountain beck is no more. While it was there something magical happened and it reached so many people. That it was only there for a short while keeps that memory special. It’s now just a story. And stories are the longest lasting of anything.

Read Full Post »

The idea of building a bridge out of paper goes back a little while for me. It’s been one of those projects that’s been sat on the back burner so long it was in danger of completely drying out. And if it wasn’t for a random DM on twitter one Sunday evening, it might still be there.

It was some years earlier that a discussion with some of the lovely folk over at James Cropper – a paper manufacturer based in the Lake District – turned to thinking “what could be made out of paper?” At the time they were interested in pushing their brand values of bespoke production, colour and environmental credentials. We’d done some pieces for trade fairs and I’d started doing some small-scale temporary pieces in the landscape for photographs. The thing about brainstorming is that you can come up with ideas and not worry about how practical or realistic they are. I think I said it would be great to do something structural – like a wall, or a building, or a bridge.. or something along those lines, and that’s often how so many of my pieces start life. I open my mouth without thinking, and as soon as I’ve uttered the words they somehow echo and linger. And I start to dwell on them. Yes, a bridge. That would be amazing if we could do that. Obviously I had no idea how to do it, but the idea seemed to stick.

red boxes

red paper boxes on Ullswater. 2010.

Of course, when I started to look at it and do the research I discovered it wasn’t as left field as I thought. Building a bridge out of paper was a standard year one exercise in architecture courses all over the world. An exercise in creating strength from lightweight materials. These however were just models even though some could take the weight of people.

Then there’s the work of Japanese architect Shigeru Ban. In 2007 Ban built a full-sized paper bridge over the River Gard at Remoulin in France. Ban had gotten over the structural and scale issues by using paper tubes. Paper tubes are an inherently strong but lightweight form and work well in both compression and tension along their length. Fabricated steel joints hold everything in place.

shigeru ban paper bridge

Paper Bridge by Shigeru Ban. image © Mikaël Pors

However, I wanted to do something in just paper. I wanted the purity of a single material. This idea that something as seemingly fragile as a single sheet of paper could be the building blocks of something substantial.Something of real structural integrity. Capable of withstanding the Cumbrian weather and strong enough to function as a footbridge. The solution lay in some of the earliest bridges in the Lake District – packhorse bridges.

packhorse bridge Watendlath Cumbria

In the days before roads trading goods were moved across the country by packhorse – loading up horses and trekking them in convoy across the land. With no wheels to get stuck in mud it was a very versatile way to move things across difficult terrain – as in the case of the Lake District. Where rivers ran too fast to safely ford, simple stone arch bridges were built. Originally these were very basic, using local found stone and built over a wooden formwork, using lime mortar to cement the stone together. Once constructed the formwork was knocked down or burnt leaving a simple arch. There was no wall on either side of the pathway as this would restrict the size of the packs on the horses. The bridges were also used by drovers moving sheep to and from markets. Only when the tracks were upgraded and carts and waggons started to use them were sides added to the bridges to stop them from falling off. Carts also meant bridges had to be wider and more substantial with easy gradients up to the top, whereas the original packhorse bridges were frequently steep arches and only three-foot wide.

I found a great book – ‘An Illustrated Guide to The Packhorse Bridges of the Lake District‘ by Michael Hartwell, and set off to familiarise with bridges in the Lake District landscape.

book cover

The construction of a stone arch is very simple and dates back thousands of years.  Wedge-shaped stones – or voussoirs – are laid over a former. The final, topmost stone – the keystone – effectively holds it all together. In a paper bridge, all the stones are just pieces of paper. Structurally, the internal angles of the wedge shapes result in the vertical force (the load on the arch) being transferred to lateral tension (sideways force where it meets the ground).

notebook page

basic calculations for the final bridge

I could calculate how to build it on paper by simple geometry. If I knew the size of the blocks of paper and the radius of the arc I could determine how many ‘sides’ a polygon of those blocks it would take to go across the arc. Knowing the number of sides I could also work out the angle between them that I needed to fill with wedges. As I knew the dimensions of those wedges from the paper size I could work out the size of stacks of different sized pieces it would take to bridge that angle. I needed sufficient different sizes to brace across the gap evenly and also get small enough pieces to get as close to the upper edge as possible. The strength in the arc comes from ensuring the blocks are tight on the bottom edge and are wedged tight across the top edge. It’s also important not to make the mid-sized blocks in the wedge too big as, under load, the bridge would have a tendency to pivot on those points and make it rock. When it came to the bigger models and the final piece, those small packs of 10 or 11 sheets were critical. One too many small pieces of paper in one of the wedge sections might not seem much in the 20,000 pieces of paper scheme of things, but an extra sheet in one block equates to 150 sheets over the whole arch – approximately 40mm – and the whole bridge becomes very unstable.

stack drawing

drawing of stacks making up a single block and wedge

I think I built the first paper model bridge in 2011. It was very haphazard but it worked and held a fair weight. It was quite a shallow arc made by stacking small pieces of paper over a former and then wedging other sheets in a various intervals until it stayed up. The next model was more refined. I knew then how it worked. Using small pieces of paper left over from a project years before it easily held more than its own weight.

first model paperbridge

the first model paperbridge. May 2011

original sketch

the first sketch of a paper bridge

_DSC1846 - Version 2

Second model. 2012

By this time it was looking like this just might be possible. I’d even found a location where I thought it would look right – with big Lakeland fells around it, a fast flowing beck underneath and footpaths on either side. There was no point building a bridge that didn’t go anywhere.

But, could I build one that would take the weight of a person? And how would it work outside? What would happen when it rains? Only one way to find out. Build a bigger one.

Croppers kindly supplied me with a quantity of paper cut to approximately A4 size. From these I trimmed smaller sizes to make wedge-shaped stacks. I built this first decent-sized bridge one evening in my front garden. I left markers at intervals so I could take it apart again and keep the paper in blocks. It was March when I built that, so it was getting dark early. I got it all assembled to a certain point and left it until the morning to fine tune it.

A4 model

first A4 model

Overnight the cloud came down and it was a bit misty in the morning. I just needed to move some of the blocks and add a few more wedges I thought to make a better arc. It was then I discovered what happens when the paper gets wet. The bridge was rock-solid. There was no way I could easily take sections out. When the paper got wet, the fibres swelled. As all the paper was in compression all the swelling pressure went against the abutments as it had nowhere else to go. I left that test bridge up outside the house for nearly three months in rain, snow and occasional sunshine. It didn’t go anywhere.

_DSC2674 - Version 2

The next test build was in the Howgill Fells overlooking the M6 Tebay Gorge. This was the first one over running water. It was a blistering hot day and there wasn’t much water coming down the beck, but I wanted to see how it worked in a more real landscape environment.

test model in howgill fells

test model in the Howgill Fells. 2012

The colour was a bit cold against the foliage and the bridge seemed to flatten out at the top, but this is what test are for – to find all the problems so they can be solved before you go for the big piece.

From this point on the project hung around for a few years. Both the paper manufacturer and the Lake District National Park were keen to help realise the bridge, for one reason or another things never quite came together at the same time to make it happen.

I’d been showing mock-ups of the PaperBridge in presentations and lectures around the world for a few years. It was always something I used to show my working methods and the potential for public / private enterprise. It aways went down well too – there was something about it that caught people’s imagination. Whether that was the bold use of colour in the landscape, or the ambition, or the engineering.

mock-up

visual for paperBridge at Greenside, Glenridding. 2012

Earlier this year I was surveying my growing list of unrealised projects and looking to see which ones I could look to finally get done this year. Looking at how progressed the idea was and what was needed to actually bring it to fruition. The PaperBridge seemed to be pretty much there. It was all designed, engineered, tested, materials sourced, legal and health & safety implications sorted. It even had a location and permissions. I’d even gone through the PaperBridge as an example project when I met with Wolfgang Volz over the winter. All it needed was some money for materials and build costs. Although that doesn’t sound like much, finding funding is always more work than you think, so I pencilled it into my diary as something to start working on in the summer. A standard delay tactic.

So when that random twitter message came through asking if I was interested in doing something in the Lakes, the timing couldn’t have been more perfect. Here was a client looking for something high-profile and ambitious in the Lake District landscape, and I just happened to have something all ready to go. Just as well as the proposal would need costing up and presenting in 10 days, and if successful, delivered in just 10 weeks. Under any normal circumstances that would be just impossible for a project of this scale. I don’t normally put proposals forward to open calls – coming up with project concepts, working out all the logistics and drafting up a budget alone can be a huge amount of work with no guarantee of anything coming off it. In fact I’ve never had any commission come off this way, so I stopped doing it. However, I had everything just sitting there, ready to go – although I had no idea how much it would cost, but sure I could do it within their budget. If only just. it was worth a shot.

On the 22nd February I got an email inviting me to realise PaperBridge as part of a new cultural event in Cumbria and the Lake District – Lakes Ignite. The lead-in time for the paper production and my other work commitments meant there was just a 10 day window it could be done in during May. So that was it. Ten weeks to deliver a full-sized bridge out of paper.

working drawings

working drawings for a bridge – not the final one though..

Of course things never go smoothly. The tight timetable meant the National Park people couldn’t re-jig their busy rotas to provide the build help I was hoping for. Due to a locally controversial planning application near the original Greenside location, it was thought best not to do anything on that site this year. That meant looking for an alternative location, obtaining permissions, surveying, re-designing the bridge and re-calculating the engineering.

bridge redesign

redesigning the bridge in the studio

Lots of long days in the studio and late nights with my note-book, bits of paper, cosine calculators, building and rebuilding scale models, revisiting the site as it slowly greened up through the early spring, taking photos, generating visuals and eventually it started to come back together again.

grisedale mock-up

early mock-up of the bridge in Grisedale

A couple of years or so ago, when we were looking at a 16 – 21 day installation period at the original location a short walk from a car park, we were looking at visitor figures in the region of 10 – 16,000. The Lake District is a great place to do this kind of work – there’s so much quality landscape environment to bounce off. It’s a well-known area and comes with its own unique sense of international branding. THere’s also plenty of other things to offer visitors so an artwork can make part of a great day out or weekend away.One of the challenges however can be the number of visitors to the area – much more than you would expect in most rural locations. While I knew the paper would easily support the weight of people on it – we even looked at the idea of taking a horse over it for a photo opportunity – I had no way of knowing what the effect of 16,000 pairs of muddy boots would do to the surface of the bridge. With that kind of visitor figure we’d need to put invigillators there to avoid bottlenecks of visitors and make sure everyone was safe on it. However, at this new, much more remote location – remember it’s a good 5 mile round walk from a car park – crowds were not going to be a problem. It was going to be something that passing walkers would just happen across. Maybe up to 100 people a day on busy sunny weekends.

I quite liked that aspect of it – a piece so remote and temporary that it became something special for the few who saw it….

Read Full Post »

Good things come to those who wait. Patience is a virtue. Cliché cliché maybe.

I’ve had my fair share of mad, short timescale projects. Some so short they almost felt like instant pop-ups. ‘Level’ in Peterborough earlier this year was devised and realised in 30 days.

Level in Peterborough

The ‘Paviljong’ in Sweden was a 14 day project, while ‘Souvenir’ in Shanghai in 2006 was less than 10 days from concept to finished pieces. Pieces like this are born and raised on adrenalin. It’s the only way.

My latest project, on the other hand comes from the opposite end of the timescale spectrum. ‘PaperBridge’ has been hanging around my life on and off for nearly five years, but a couple of weeks ago it finally became a reality.

PaperBridge

Around 22,000 pieces of paper arch over a beck at the foot of the Helvellyn range in the English Lake District. The bridge weighed over 4 tonnes and could support the weight of 60 sheep (if you could fit that many on it), yet it didn’t use any glue, nuts, bolt, screws or any other fixings. It was just pure paper wedged between two cages of stone.

Despite the long gestation period, it’s still felt a bit of a whirlwind project and the last two weeks of my life have been some of the craziest in a long while.

The bridge is in a fairly remote valley in the Lake District. The nearest village is Patterdale at the south end of Ullswater. Getting to the village from anywhere else requires either a long winding journey down the length of the second longest lake in England, or up and over the Kirkstone Pass – one of the steepest mountain passes in the country. From Patterdale (population 400) the bridge is a good two mile walk up the Grisedale Valley. A mass-tourist destination it isn’t. Because it’s a bridge made only of paper I wasn’t sure how well it would take to thousands of people crossing it, so I put it in a place where I thought not so many people would venture. It’s on the main Coast to Coast long distance path and there’s a nice 5 mile circular from the Ullswater villages, so it would get passing visitors OK and maybe the odd person venturing out just to see it.

location-big maps

I’d allowed four days for the install incase of bad weather and to have some breathing space. I’d got a good team to hep build – Phil had helped build an earlier test piece, Ewan and Michael built drystone walls in Teesdale together (Ewan was also part of the God’s Bridge project a couple of years back), and there was Li – a second year architecture student from Newcastle. It was a pretty simple build once we got started so it should all be straight forward.

Michael and Phil had built the gabion abutments the week before to give them time to settle. There was a fresh fall of snow on the fell tops that day. Walking up the track towards the valley head those rocky peaks looked the daunting mountains they really are. This was the wild Lakeland landscape I was after. Not the bit most of the 16-million tourists who visit the Lakes each year see. The shocking statistic is that around 95% of visitors to the Lakes don’t travel further than 80m from their cars. I’ve seen them down at Bowness on Windermere cooing over the water and boats, eating ice cream and happy to be in ‘The Lakes’. Chiang Yee had seen the same thing back in the 1930’s. It hasn’t changed. But for me, those mountains. Those scary crags are what have really shaped the western idea of landscape. Writers, thinkers, poets and artists have been inspired by these distant, towering rocks over the past 200 years. Their names as old and layered with hinted stories as the art they inspire – Dollywagon Pike, St. Sunday Crag, Pinnacle, Striding Edge. The stream the bridge crosses – Nethermost Cove Beck – its name littered with the remnants of a Viking past.

installing the gabions

It had been a glorious April on the whole and every site visit I’d made this year had been still and sunny. It lulled me into a false sense of security. The Cumbrian weather had other ideas come May.

The first day was due to be just getting materials onto site. I’d arranged for all the paper and the wooden formers to be delivered on the same wagon so that everything could be carted up the track by tractor in one go. By the time the delivery wagon arrived it had been raining for over 12 hours non-stop. We knew this was no longer going to be as simple as we wanted. I followed the wagon up the narrow and steep track to the farm in the pouring rain, grateful that finally things were arriving. Only to discover that instead of 7 pallets with 4 tonnes of paper, there was only two pallets to unload. With no mobile phone signal in the valley I left the the farmer to cart what was there up as near to the bridge site as he could get and the team to move it the last bit by hand while I went off to sort the case of the missing consignments.

delivery wagon

By the time the rest of the materials were delivered the next day so much rain had fallen in the valley that the farmer couldn’t get a tractor anywhere near the bridge site. A frustrating 24 hours where we could do no more than check into the cottage I’d rented for the team and twiddle our thumbs.

By 7am on day three the sun was out and the wind had dropped. After fuelling on breakfast butties and tea we got an early start on things.

First task was putting together the flat-packed plywood former that the bridge was to be built over. The form was designed with Peter Foskett who’d previously worked on the ‘Seven Spires’ piece back in 2011. The former was designed in two halves and precision cut by CNC machine in Carlisle. The form was held together by pegs cut from the same sheets so the whole thing could be assembled without tools. The form was then supported on screw jacks and acrow-props between the abutments. One of the key secrets in the formwork design was the way the two halves could be jacked-up in the middle to help get the final pieces of paper in and keep the compression high across the arch.

IMG_0640

Once the former was in, it should then be a simple process of stacking the paper over the top. Two packs of paper followed by a wedge made of smaller sheets – the size and quantity having been predetermined in the design process. Nice and simple.

IMG_0658

Only the paper was in packs of 100 sheets – each sheet measuring 900mm x 700mm. Each pack weighing 17kg. And ALL the packs were on pallets over 500m the other side of a bog. The only way to get the paper onto the site was to carry them by hand. All 168 of them.

This wasn’t going to be a quick process.

pallet of paper n landscape

possibly the most remote pallet of paper ever

Paper that size and in those quantities isn’t an easy thing to handle. Once out of their protective wrapping the packs quickly lose their shape and rigidity. What started out as a one person job to stack the paper became a five person task by the end of the day.

As the day progressed we got slicker at building and got into a rhythm. The weather continued to improve so we kept going while things were in our favour. But by 8pm we were exhausted. Twelve solid hours hefting large packs of paper around was enough.

L1130641

Elm How was a great base for the install team. A huge traditional farmhouse with amazing original flagstone spiral staircase, it was large and comfortable and quiet. And only 15 minute walk up to the bridge site. Surrounded by fields of pedigree swaledale yows with their newborn lambs and shorthorn cattle calving in the barn next door, by night it was all stars, hooting owls and wandering badgers. Its isolation came with disconnection from the rest of the world – no mobile signal, no internet. On a morning when the rest of the country was waking to the aftermath of the general election, we were blisfully unaware of any of it. And it was lovely.

My original plans had been to build the bridge mid-week and if we got ahead of ourselves we’d just wrap it up in tarpaulins until the Friday morning. There had been a fair bit of media interest in the bridge over the previous week or so and I’d booked a minibus to bring people halfway up the track for the press launch. The 16-seater bus had already been over booked with photographers and at least two different TV crews. However, on the Thursday night I’d driven down into the village to pick up some leaky wifi to send some emails and discovered that every single press photographer and TV crew had cancelled at the last minute to do vote counts.

So press launch was to be a no press launch.

At least the pressure was off. We just had to get the bridge built by late morning in time for whoever decided to still come on the bus.

L1130647 L1130648 L1130653 L1130654 L1130655

As the final pieces were being hammered into place as small crowd was gathering on a rocky outcrop on the other side of the bog. The couple staying in the cottage behind Elm How had also come down to lend a hand. The plan to raise the centre sections up to get the last pieces of paper in didn’t quite work to plan as the acrow-props were being jacked further into the river bed rather than lifting, so the final pieces were done more with brute force and heavy whacking.

By the time the wooden formers were lowered and slid out there was a fair crowd gathered along both sides of the beck. a loud cheer as the final piece was removed and the pure red arch remained leaping over the water. I had expected the arch to sink a little at the top as the formers were lowered, but all that hammering and wedging the final pieces paid off and it didn’t move a jot as one side then the other was gradually lowered and I could see daylight between the paper and the plywood.

Despite the nearly five years of development, the many scale models, the months of testing in all weathers, and the long hours designing every last millimetre – that sense of relief when finally those thousands of sheets of bright red paper finally stood there on their own was immense.

While I tried to comprehend the wave of emotions sweeping through me as I stood next to that newly-born artwork, I had no idea this pile of paper was going to run my life for the next two weeks…

‘PaperBridge’ was commissioned by Lakes Culture with support from Arts Council England

Read Full Post »

Older Posts »